ABB provides low-voltage electrification solutions for MRT Jakarta Phase 2

ABB provides low-voltage electrification solutions for MRT Jakarta Phase 2

ABB has been selected to provide low-voltage electrification solutions for MRT (Mass Rapid Transit) Jakarta Phase 2, a major expansion of Indonesia's flagship metro network under the National Strategic Program (PSN). The project builds on ABB's involvement in MRT Jakarta Phase 1 – the city's first and currently only operational metro line – and positions ABB as a trusted partner in Jakarta’s evolution toward integrated, sustainable public transportation.

With around 42 million people living in the Greater Jakarta Metropolitan Area, the pressure on urban infrastructure has never been greater. As Indonesia accelerates its push for smarter, greener, and more connected transport systems, MRT Jakarta Phase 2 represents a critical initiative to reduce congestion, strengthen mobility, and support the city's long-term sustainability goals.

For this Phase 2 project, ABB deploys a comprehensive suite of low-voltage energy distribution solutions such as System Pro M compact and energy management systems, enabling reliable and scalable power delivery across project facilities. ABB also supplies its System Pro E Power low-voltage switchgear, with part of the production carried out locally in Indonesia, underscoring ABB's commitment to supporting local manufacturing and advancing sustainable practices.

center

“Jakarta's ambition to build a world-class metro network comes with the highest expectations for safety and reliability. Commuters will depend on a power system that never fails, and our solutions are built for exactly that – delivering the reliability, safety, and operational resilience that a city of around 42 million people demands. With local production and support, we're committed to keeping this system running smoothly for decades to come,” Thian-Wai Hiew, Vice President of Marketing & Sales, ABB Smart Buildings and Smart Power, Indonesia.

“MRT Jakarta Phase 2 is a critical step in our vision to transform how the city moves. By partnering with ABB, we are securing the reliable and scalable electrification infrastructure that will serve millions of commuters safely and efficiently. ABB's proven expertise – demonstrated through their support of Phase 1 – gives us confidence that Phase 2 will set a new standard for sustainable public transportation in Indonesia” said Rendy Primartantyo, Head of Corporate Secretary Division at PT MRT Jakarta (Perseroda).

The low-voltage switchgear and the components have been progressively installed in the electrical panel rooms, helping ensure a reliable power supply while enhancing the safety of both the installation and the operators. ABB's commissioning is scheduled for completion in 2027, to align with the targeted opening of the Bundaran HI–Monas section.

About MRT Jakarta Phase 2

MRT Jakarta is a cornerstone of Indonesia's urban transport development. Phase 2 of the North–South Line extends the network northward from Bundaran HI and is divided into two stages:

Phase 2A — seven underground stations from Bundaran HI to Kota, spanning 5.8 kilometers, with construction underway. The first segment (Bundaran HI–Harmoni) targets operations by 2027, and the full Phase 2A (Harmoni–Kota) by 2029.

Phase 2B — two additional underground stations (Mangga Dua and Ancol), extending the line by approximately 6 kilometers, with completion targeted for 2032.

Once fully operational, the extended North–South Line will significantly strengthen Jakarta's public transportation network, reducing congestion and supporting the city's long-term sustainability goals.

As Jakarta continues to grow upward and outward, its metro network must keep pace. With proven technology, local commitment, and a track record in critical infrastructure, ABB is ready to power every kilometer of that journey - today, and for decades to come.

END

Endnotes

  1. https://www.un.org/pl/node/236908

Links

Contact us

Downloads

Share this article

Facebook LinkedIn X WhatsApp