ABB Bailey Beijing Engineering Co., Ltd. is the process control system supplier and center of excellence of ABB Group for automation and information management of utilities industry in China. 

Our products include: distributed control system, turbine control, monitor and protection system, real time information management and optimization system, enterprise management information system, smart multi-fuel flame detection system, flue gas carbon content analyzing solution, and provide the whole set of ABB electric equipment with high、medium、low voltage in the power plant.

Statement

Download
Milestones
Contact us

2017

  • Won Delingha 50MW solar power generation DCS – the first solar project of commercial operation

2016

  • Ecuador Coco Codo Sinclair Hydropower Plant (8x187.5MW) put into operation – the largest overseas hydro project of China Electric Power Construction

2015

  • Ethiopia GIBE III Hydropower Plant (10x180MW) put into operation – the largest hydro power plant in Africa
  • Wanzhou Power Plant, Shenhua Group 2x1000MW PROFIBUS put into operation – the first 1000MW PROFIBUS project

2011

  • Released the new generation control system—Symphony Plus

2009

  • Asia Power Award

2006

  • "Asian Power Project of the year" award

2005

  • "Promise-keeping enterprise for the year of 2005" award
  • "Machine industry 100 tops enterprise for the year of 2005" award

2004

  • "Promise-keeping enterprise" award 

2003

  • ISO9001: 2000 certification
  • The best after service Unit awarded by user

2002

  • "High-new technology enterprise certificate" award

1996

  • ISO9001:1994 certification

Since 1994

  • Top Ten Foreign Invested Companies awarded in Beijing

1989

  • Company established

Company President: Cruise-Feng Li

Address:
No.10 Kechuang 10th street, Economic-Technological Development Area, Beijing, 101111, China

Tel:  +86 10 8086 3366
Fax: +86 10 8086 3324

Select region / language