Mercedes Pappas, Salzburg

Offices

The Mercedes Pappas project is an ultramodern corporate headquarter including administrative and social rooms as well as sales and a showroom for high-quality cars. Furthermore, the building also has a service garage, using the most up-to-date techniques.

What were the challenges in fulfilling the wishes of the customer?

The high functionality of the building complex represented a large challenge, as well as the integration of safety conducting systems (Siemens Winguard) and the combination of an alarm technology.

Why was the decision for a KNX solution made?

A important advantage of KNX is it´s capacity to integrate foreign system-components without difficulty. Due to the European standardisation various possibilities are open. A substantial point is ROI (Return on Invest) and the associated chance to minimize the operating costs. Moreover, the high know-how on the market led to the acceptance of the KNX solution.

Applications

Lighting Control and Regulation

  • Switching
  • Dimming
  • Central Control
  • Time Control
  • Daylight Dependant Switching
  • Constant Light Regulation
  • Light Scenes
  • Control via DALI

Blind and Shutter Control

  • Time Control
  • Weather Dependant Switching (Wind, Rain, Frost)
  • Central Control
  • Type of Sun Protection: Blind / Shutter

Heating, Ventilation and Air Conditioning (HVAC)

  • Window Position Dependant Control

Energy and Load Management

  • Consumption Measurement
  • Circuit Monitoring

Security and Fault Monitoring

  • Peripheral Protection
  • Internal Surveillance
  • General Fault Handling

Operation, Indication and Visualisation

  • LCD Display
  • Visualisation via PC

Key Data

General Facts

Owner / Investor

Pappas Gruppe

Location

Austria, Salzburg

Type of Building

Offices

Year of Construction

2006

Architect

Kader / Wittfeld

Consultant

Elektrotechnikplanung Konrad

Integrator / Contractor

Elektrotechnik Schilchegger GmbH

Floor Space (m²)

35.000 m²

No. of Floors

6

No. of Offices / Rooms

260

KNX Installation Facts

Number of Lines

43

Number of Components

2.023

Construction Volume

38 Mio EUR

Electrical Installation

6 Mio EUR

KNX Proportion

10 - 12%                                     

Photos

Select region / language