Secondary Modern School and Borg Mittersill

Education

The Mittersill secondary modern school is one of the most important in Austria. At present, 472 pupils attend classes, under the authority of 54 teachers. This is a unique school project in the eyes of the country, in that not only is it a national school but also a federal one. The school also incorporates a large Sports hall, used for extracurricular activities aswell.

What were the challenges in fulfilling the wishes of the customer?

The client requested a central control through the school´s network, also allowing access to different user groups. For example, it had to be possible for the teachers to access the KNX- functions in order to use them in the classroom.

Why was the decision for a KNX solution made?

The KNX solution has proved to be very reliable during use and has very low maintenance rates. Thanks to that, further savings can be made in addition to reducing energy consumption.

Applications

Lighting Control and Regulation

  • Switching
  • Dimming
  • Central Control
  • Time Control
  • Daylight Dependant Control
  • Constant Light Regulation
  • Control via DALI

Blind and Shutter Control

  • Time Control
  • Weather Dependant Switching (Wind, Rain, Frost)
  • Movement to Preset Positions
  • Central Control
  • Type of Sun Protection: Blind and Shutters

Heating, Ventilation and Air Conditioning (HVAC)

  • Time Control
  • Window Position Dependant Control
  • Presence Dependant Control
  • Type of Heating/ Cooling System: Radiator and Floor Heating

Energy and Load Management

  • Circuit/ Socket Outlet Switching
  • Circuit Monitoring

Security and Fault Monitoring

  • General Fault Monitoring

Key Data

General Facts

Owner / Investor

Salzburg Wohnbau

Location

Austria, Mittersill

Type of Building

Education

Year of Construction

2006

Architect

Kada-Wittfeld

Consultant

TB InstaPlan - Ing. Hans Steurer

Integrator / Contractor

Ing. Hans Steurer / Elektro Aberger

Floor Space (m²)

9,900 m²

No. of Floors

5

No. of Offices / Rooms

140

KNX Installation Facts

Number of Lines

19

Number of Components

998

Construction Volume

11 Mio EUR

Electrical Installation

0.85 Mio EUR

KNX Proportion

20%                                              

Photos

Select region / language