Ghana Water and Sewerage Corporation (GWSC) of Accra in Ghana needed to have 2 major water pumping stations (Kpong Low Lift and High Lift) refurbished, without major interruptions.
The project was awarded to ABB on a turnkey basis. The turnkey order for the two pump station refurbishment was executed by ABB with various partners and sub-contractors.
It comprised the complete design, engineering and execution of all mechanical, electrical, control, instrumentation and civil works