ABB has supplied the entire electrical, instrumentation and control equipment, plus the SCADA for the pumping stations and the treatment plant. The control system consists of the IndustrialIT System 800xA with Controller AC800M and state-of-the-art S800 IO-system.
After completion of the 1st stage, 65000m³ of drinking water a day will be treated and delivered. This will be followed by the second stage of extension, dimensioned to deliver the same amount of water, so that the total output will be increased to 130000m³/day. The reservoir for the treated water has a total capacity of 15000m³.