Metso Power hired system integrator COWI, an ABB partner for automation systems, for the programming. COWI is operating and carrying out industrial projects within the process and energy sector.
“We have many assignments for the process industry and combined heat and power stations, so this is a normal task for us. Things have gone very well; ABB has a very good process control system,” says Stefan Ottosson, section head at COWI in Gothenburg.
COWI’s programming work and function tests have been carried out in close collaboration with Metso and ABB.
“Metso is responsible for the time plan and when commissioning is approaching, we support them in checking signals, start-up of routines and other start-up procedures. Then the programmers from COWI are on site all the time,” Stefan Ottosson concludes.
Commissioning has taken place under the autumn of 2009 and during this period, among other things, Mölndal Energy’s operators, system administrators and Göran Lundström have been trained in the control system by COWI.
“A good control system with such things as an alarm system and monitoring of the district heating network is critical for operations. In addition, we have a continuously ongoing process for changes and improvements and for this reason the kind of flexible system sold by ABB is a great advantage,” says Göran Lundström.