Case history - Panel builder
Enrico Provato, who is in charge of the Energy Systems Engineering and Innovation department of Automazioni Industriali Elektronorm, explains the importance of using ABB software in all stages of a plant engineering project, particularly when little information is provided by the customer. In fact, using these tools enables the preliminary design stage to be linked efficiently with the switchboard construction stage, significantly optimizing the time required to complete a job order and meet a myriad of plant engineering needs.
- Production efficiency starting with insufficient input data
- Reduction in time taken to fulfil customer requests
- Immediate link between design stage and construction stage
- Simplification of transfers between functions, even in highly structured contexts