NaKika, Gulf of Mexico


Electrical heating – ready intervention spread power and control system for pipe heating


ABB supply:

  • 480 MNS switchgear and distribution: ABB Sache Emax and Isomax breakers
  • Asymmetrical transformer 480V/11kV, 1345kVA. Tap changer + 3 different 1 phase outlet. Uout 933V - 1090V
  • 11kV switchgear: Breaker and selector function including protection, control and measuring facilities
  • 1 phase subsea transformer 8.7kV/1.25kV, 1375kVA for 2500 meter depth
  • Automation load balancing system: Reactor and capacitor bank located in a separate container
  • Industrial IT: AC800, control builder, process portal HMI, automised heating process


Project facts:
Field operator
Shell
Application Ready intervention
flowline heating
Field NaKika