Wind Turbine Installation Vessel (WTIV)

Wind Turbine Installation Vessel (WTIV) - ABB Marine & Ports
We offer a comprehensive spectrum of offerings for wind turbine installation vessels (WTIV) optimized for the requirements of installation of wind farms at sea, enabling more energy efficient, safer and more precise operations.

Related highlights


Adjusted for each operation mode

With an integrated system from ABB your vessel will be optimized for each of its operating modes, including the transit mode, the DynPos and jacking mode and the jacked-up-position Crane mode. This means that the energy consumption is adjusted for any mode, while ensuring constant power availability and safety.

Key reference

Shimizu_Corp.s_wind_turbine_installation_vessel

Shimizu Corporation’s new wind turbine installation vessel (WTIV)


ABB has been chosen to power Japan's first super-size windmill installation vessel.

The vessel's scope of supply provided by ABB includes an advanced power generation and distribution systemPower and Energy Management System (PEMS™) and remote equipment monitoring, analyzing and predictive system ABB Ability™ Remote Diagnostic System for Marine   . 

Read more about the vessel here.

Recommended offerings

Power and propulsion

Digital

Jostein Thue

Vessel Type Responsible,
Offshore Wind Vessels


jostein.thue@no.abb.com
+47 952 91 389
Jostein Thue - ABB Marine & Ports
Select region / language